How to measure the DC operating current of a PV installation with the PV200 or 210?

1. Disconnect all cables from the PV test inputs (8 & 9 in figure 2).

2. Connect the current clamp to the red – black 4mm probe inputs.

3. Move the current clamp switch to the 40A position.

4. Press the zero key on the current clamp for a few seconds.

5. Place the clamp around the DC cable of the solar installation.

6. Press the Viso key until the clamp icon (figure 3, icon b) appears on the LCD.

7. The measured current is shown on the LCD next to the clamp icon.

Note: The Auto key is disabled whilst the DC power measurement is in use.

Stay in the know
Sign up to our mailing list today to stay up to date with the latest industry news and information from Seaward.

I'd like to talk to a sales advisor

Our team of sales advisors are on hand to help you with any queries you have about our products.
;