How to measure resistance Rpe with the PV150?

To make a single measurement:

1. Connect the red and black test leads as shown.

2. Press the Rpe key.

3. The resistance between the test probes is displayed.

To make a continuous measurement:

1. Connect the red and black test leads as shown.

2. Press and hold the Rpe key until the lock icon appears on the LCD.

3. The resistance between the test probes is displayed.

4. Press the Rpe key to terminate the continuous measurement mode.